Apps · MKC-APP-003
MK IsoManager
Shows which isometric sheet every component is on, and which sheets no longer match the model.
- Writes the isometric sheet number to every piping component
- Shows which sheets are outdated, what changed and where
- Issues sheets with revisions and checks them against the model
- Exports an ISO register to Excel: lengths, shop and field welds by DN
- Places a 3D view of the piping on each isometric sheet
Version 1.0 doesn't yet support projects stored in Autodesk Vault or Autodesk Docs.
239 EUR
per seat · excl. VAT · 5 seats for 1 079 EUR
Launch priceuntil 30 November, then 299 EUR per seat.
Prices exclude VAT. Applicable VAT or other indirect taxes may be added depending on your country and tax status. The final price, including any taxes due, is shown in the payment summary before you pay.

- Licence
- Perpetual
- Updates
- Free within major version
- Trial
- 7 days
- Works with
- Plant 3D 2023–2027
- Platform
- Windows
Pricing.
Paid once · perpetual licence · excl. VATSeats
Perpetual licence, paid once, not yearly. Every update within the major version is included. A future major version may be a paid upgrade.
One key, activating one machine.
Launch price until 30 November. After that: 299 EUR.
Prices exclude VAT. Applicable VAT or other indirect taxes may be added depending on your country and tax status. The final price, including any taxes due, is shown in the payment summary before you pay.
See it work.
Syncing sheets, checking revisions and exporting the ISO registerHow buying works.
One key, one machine- 01
Order your seats
Pick the number of seats, say whether you're buying as a business or privately, and send the order form. A business adds its EU VAT ID and the invoice is made out to it.
- 02
Pay
I reply by email with the payment details. Nothing is charged on this site.
- 03
Send your Machine IDs
After payment you get the installer. Install it, open Plant 3D, open the plugin's licence window and reply with the Machine ID it shows, one per seat.
- 04
Get your keys
Keys arrive within three working days of payment, with my VAT invoice for a business order. Private buyers get theirs from Link when they pay. Paste the key into the plugin and it's active.
Keys are issued by hand, so they don't arrive instantly. If your Machine IDs reach me after the payment, the clock starts when they arrive.
What it's worth.
A worked example · change anythingPlant 3D can't tell you whether an issued isometric still matches the model. Today a person answers that by comparing PDFs, overlays and material lists, sheet by sheet. On a project with hundreds of sheets and several issues, that is weeks of a designer's time — and one outdated sheet sent to prefabrication can cost more than every licence together.
Your project
Minutes by hand
Where these minutes come from
- Welds and pipe lengths for the ISO register:
- 5 min per sheet, at every issue. Open the sheet, count the shop and field welds by DN from the weld symbols or the weld list, add up the pipe lengths from the cut list and type both into the register. Done again at every issue, because sheets change in between.
- Finding what changed on revised sheets:
- 15 min per revised sheet, per revision. Overlay the issued PDF on the new one, or compare the two material lists, find each difference, cloud it and write the revision description.
- Finding outdated sheets before each issue:
- 2 min per sheet, at every issue. Check whether the lines behind the sheet were changed in the model since it was last issued, often by other designers and without a note. Quick for a sheet that hasn't changed, which is most of them.
- Issuing revisions and updating the register:
- 3 min per sheet, at every issue. Raise the revision in the title block and the revision table, add the row to the register, and save the PDF and DWG to the issue folder.
- 3D views on the sheets:
- 8 min per sheet, once. Isolate the line in the model, set up a view, take the screenshot, then paste and scale it on the sheet.
These are my own figures from live projects, kept on the low side: an experienced designer on a tidy project. The quickest check is to time one sheet of your own and put that number in; the totals follow. With MK IsoManager the same work runs on all sheets at once, so it takes minutes per issue rather than per sheet.
Per project, estimated
Welds and pipe lengths for the ISO register
Finding what changed on revised sheets
Finding outdated sheets before each issue
Issuing revisions and updating the register
3D views on the sheets
By hand With MK IsoManager
About 2 months of one designer's time on this project. The time by hand grows with every sheet; with MK IsoManager it stays a matter of minutes per issue.
An estimate, not a quote. It leaves out what an outdated isometric costs once it reaches the shop or the site: a remade spool, material, a crew waiting, another RFI.
MKC-APP-003
Try it on your own model.
Full functionality for 7 days. Leave your email and I'll send you the installer.
MKCad